Guides
Bath to walk-in shower: what to expect, step by step
Priya Rowe28 Oct 20264 min read
Swapping a bath for a walk-in shower is usually a five to seven day job. It is quick because the pipework is already in roughly the right place.
Days 1 and 2
We strip out the bath and tiles, check the floor and fit a new low-profile tray or a fully tanked wet-room floor.
Days 3 to 5
Tiling, glass screen and thermostatic valve. The toilet and basin stay usable on most evenings.
Days 6 and 7
Silicone, lighting, extractor fan and a final clean. Wait 24 hours before your first shower so the sealant cures.
Related reading